- Corporate
- Case studies
Built, delivered, documented.
Real projects with the specification, the build and the handover on record — mobile units built to a client's written brief, and heavy fabrication well beyond transport equipment.

A hazmat trailer for a power station spill team
Twin-axle, all-aluminium, five lockable roller shutters and its own battery. Built in five weeks in Roodepoort and delivered to an Eskom Generation site on 13 August 2026.

A Chrome Beneficiation Washplant, Fabricated and Commissioned
Trailored built the steel for Flow Minerals' chrome washplant from drawing to start-up: feed bins, wash bins, slurry distributor heads and an eight-metre spiral support structure, erected and commissioned on site.

From 34-Ton Tautliner to Mobile Film Studio
Trailored stripped a 34-ton curtain-side tautliner back to its chassis and rebuilt it as a self-contained mobile film studio — private dressing rooms, an en-suite bathroom with full plumbing, and on-board power, all road-legal on the original tri-axle.
— Why we publish these
Proof a procurement team can check.
Each study names the client where we are permitted to, states the specification we built to, shows the workshop photographs, and ends with the handover date. That is the record a tender evaluator or programme lead needs, not a brochure claim.
— Start your project
Have a unit, plant or conversion that needs building?
Send the specification, or tell us what has to fit. A dedicated consultant replies within one working day with a scope and indicative lead time.